The Energy Performance
of Buildings Directive was first introduced into the UK in January
2006, with a three year implementation period ending in January
2009, to combat the threat posed by climate change.
The principal aim of the legislation is to reduce carbon emissions
by improving energy efficiency thereafter enabling the UK Government
to achieve carbon reduction targets agreed under the Kyoto Protocol.
The Directive requires the introduction of Energy Performance
Certification for residential and commercial buildings and in
addition a legal requirement to Display Energy Certificates in
public buildings.
Implementation of Legislation
The following is a summary of the key dates
for implementation:
- From April 6th 2008, Energy Performance
Certificates (EPCs) will be required for all new dwellings
- From
April 6th 2008, EPCs will be required for the construction,
sale or rent of buildings other than dwellings with a floor
area over 10,000m
- From 1st July 2008, EPCs will be required
for the construction, sale or rent of buildings other than
dwellings with a floor area over 2,500m
- From 1st October 2008,
EPCs will be required for the sale or rent of all other (existing)
dwellings
- From 1st October 2008, EPCs will be required
for the construction, sale or rent of remaining buildings other
than dwellings
- From 1st October 2008, Display Energy Certificates
(DECs) will be required for all public buildings with a floor
area greater than 1,000m²
- From 4th January 2009, deadline
for first inspection of all existing air-conditioning systems
over 250kW
- From 4th January 2011, deadline for first
inspection of all remaining air-conditioning systems over 12kWr
When is an EPC required?
EPCs contain information on the property’s
energy efficiency and estimated running costs and also advise
on further information on cost-effective improvements that can
be made to a building. For Commercial property, whether for sale
or letting, the EPC is valid for 10 years and must be made available
to any prospective purchaser or tenant at the earliest opportunity
before sale or letting. EPCs are only required for new lettings
and sales. There is no requirement to obtain an EPC for an existing
tenancy. If an EPC is valid, i.e. less than 10 years old, there
is no requirement to issue a new EPC. Landlords and property
managers are responsible for ensuring that an EPC and/or DEC
are available.
EPC Assessors
There are three levels of assessor:
Level 3 relates to simple existing buildings with commonly occurring
characteristics that can be modelled using the Simplified Building
Energy Model (SBEM).
Level 4 relates to new and more complex existing buildings that
can be modelled using SBEM.
Level 5 relates to the most complex new and existing buildings
that will need to be modelled using Dynamic Simulation methods.
All energy assessors must be registered with an approved government
accreditation scheme.
The Simplified Building Energy Method
(SBEM) will be used to measure the building’s energy
use and produce the EPC certificate.
Head Projects Building Control can produce EPC certificates
for dwellings and non-dwellings.
For further information on EPCs please contact:
smills@romans.co.uk
|